Serving Missoula, the Bitterroot Valley and Western Montana Mon to Fri, 7am to 6pm  ·  (406) 207-2524
Flat floors, straight lines

Custom Tile and Flooring Installation in Missoula, Montana

Porcelain and ceramic tile, LVP, engineered and solid hardwood, and heated floors installed by carpenters who fix the subfloor first, so the tile does not crack and the planks do not gap when Missoula's winter air dries the house out.

Flooring is only as good as what is under it, and in Missoula's older houses what is under it is usually the problem. A 1925 bungalow in the Westside has 1x6 plank subfloor that flexes between joists, a 1962 ranch in Lewis and Clark has a slab that is out of level by an inch across the living room, and both have had three layers of flooring stacked on top over the decades. Constructive Brothers handles the carpentry before the tile or planks ever show up: we pull the old layers, add plywood or cement board underlayment, sister joists that deflect too much for tile, and grind or self-level concrete so the finished floor is flat within the tolerance the material needs.

The finish work gets the same attention as the trim. Large-format porcelain is laid with a leveling system and a 1/8-inch grout joint so lippage does not catch a sock, and mosaics get laid out from the center of the room so cuts are even at the walls. LVP goes in with the expansion gap the manufacturer calls for, because a floating floor with no room to move buckles in July. Hardwood acclimates in the house for a week before installation, since Missoula's indoor humidity drops hard in January and a floor laid tight in August will open up. Heated floors under tile in a bathroom or mudroom are a small added cost and a daily pleasure in a Montana winter.

Installed flooring in Missoula runs about $7 to $13 per square foot for LVP, $12 to $22 for engineered or solid hardwood and $18 to $40 for porcelain tile, with subfloor prep, pattern complexity and heated floor mats being the main additions to those base numbers.

Get a Free Quote

Tell us about the project. A carpenter, not a salesperson, will get back to you within one business day.

No spam, no pressure. Prefer to talk? Call or text (406) 207-2524.

Why Us

Why Missoula Homeowners Choose Us for Custom Tile & Flooring

Subfloor prepped for the material

Tile needs a stiff floor and LVP needs a flat one. We check joist deflection, add plywood or cement board, and self-level slabs before installing, because a cracked grout line or a bouncy plank is almost always a subfloor problem that was skipped.

Layout planned before the first cut

We dry-lay tile and snap lines from the center so the cuts land evenly at both walls and the pattern runs true to the cabinets or the doorway you see first. It is an hour of planning that separates professional tile from a weekend job.

Wet areas waterproofed

Tile in a shower, laundry or mudroom sits over a membrane, with sealed corners and a flood test where there is a drain. Grout is not waterproof, and a pretty floor over a wet subfloor becomes a demolition job within a few winters.

Wood acclimated to a Montana house

Hardwood and even LVP move with humidity, and Missoula swings from damp spring to bone-dry January. We let material sit in the room for the days the manufacturer requires, leave the correct expansion gap, and cover it with trim so it can move without gapping or buckling.

Our Process

How a Custom Tile & Flooring Project Runs

Measure and inspect the subfloor

We measure the rooms, check the subfloor for flatness, deflection and moisture, and tell you which materials will work over what you have and what prep it will take.

Selection and quote

You choose tile, LVP or hardwood with our input on wear, water and cost. The fixed-scope quote separates material, prep, installation and transitions so you can see exactly where the money goes.

Tear-out and prep

Old flooring comes out and gets hauled off, the subfloor is repaired, leveled and underlayment installed, and any membrane or heat mat goes down and gets tested before anything is set over it.

Install, grout and trim

Tile is set, grouted and sealed; planks are laid with the right expansion gap. We finish with transitions, shoe molding and a walk-through, and the room is ready for furniture the next day.

Recent Work

Custom Tile & Flooring We've Built

See More of Our Work →

FAQs

Custom Tile & Flooring Questions, Answered

LVP, tile or hardwood for a Missoula family with kids and dogs?
For a busy household, LVP wins on cost and toughness: it shrugs off wet boots and dog nails, and a damaged plank can be swapped. Porcelain tile is the most durable and the right choice in mudrooms, baths and kitchens, especially over a heat mat, but it is cold and hard underfoot elsewhere. Hardwood looks best in living areas and can be refinished for decades, though it needs more care through our dry winters. Many houses end up with a mix.
Can you install tile over my existing floor?
Sometimes, but usually not well. Tile over old vinyl or a second layer of plywood adds height that creates awkward transitions at doorways and stresses the tile if the layers underneath move. In most Missoula houses we take the floor down to the original subfloor, fix what we find, and build back up with the right underlayment. It costs a little more up front and it is the difference between tile that lasts and tile that cracks along the joists.
Are heated floors worth it in Montana?
In a bathroom, mudroom or entry, yes. An electric heat mat under tile adds roughly $12 to $20 per square foot installed and turns the coldest floor in the house into the warmest, on a programmable thermostat that only runs in the morning. It is not a substitute for the furnace, and it makes less sense under LVP or hardwood, but under tile in a room where you stand barefoot in January it is a hard upgrade to regret.
How long does flooring installation take?
LVP in a 400 square foot living room takes one to two days after prep. Tile in a bathroom or kitchen takes three to five days because of setting and grout curing times, longer with a heat mat or a complicated pattern. Hardwood takes a day or two to install after a week of acclimation, plus finishing time if it is site-finished. Subfloor repair is the variable, and we tell you what we found before adding a day to the schedule.
Service Areas

Custom Tile & Flooring Across Missoula and the Bitterroot

Based in Missoula. One crew and one standard of work from Frenchtown to Hamilton, up the Blackfoot and over to Seeley Lake.

Related Services

Often Paired With This Work

Get floors that stay flat through a Missoula winter

Free on-site walkthrough. A fixed-scope quote in writing. Work that passes inspection the first time.

Get a Free Quote